KM. Dry Kruppman Bridge

General Description
Product Specifications
Gallery & Media
Point of Contact for further follow up
Others
Product Manufacturer
Yantra India Limited (YIL)
Designing/Manufacturing agency
YIL
Product Description

A KM Dry Krupman bridge was a temporary floating bridge. The bridge was critical for providing logistical support and transportation for troops and armor

Features/Roles/Variants of the product
The bridge served a critical role during the Indo-Pakistani War, connecting different areas of operation.
The bridges were simple structures, and the army later replaced them with more permanent solutions, such as triple-single continuous-span Bailey bridges. This system provides bridging solutions for both wet and dry obstacles
Product Specification
Basic Information
Function - Dry KM Bridge is a light weight and easily transportable bridging system. It is used to carry the latest military and civilian vehicles across the dry gap.
Span - 13.2 m.
Roadway Width - 4.2 m.
Load Capacity - 20 MT
Construction Time during Day - 2.5 Hr.
Construction Time during Night - 3.5 Hr.
Launching Weight - 6.52 Ton.
Shri Gurudatt Ray, CMD
Contact : yil[dot]hq[at]yantraindia[dot]co[dot]in , 0712-2391090
Deployments and orders received for the product
Supplying to Army